Technical documentation center

Move from a broad enquiry to a defined project basis.

International projects are easier to review when the water or solids duty, layout, interfaces and open questions are structured before equipment is compared. Use this page as a preparation guide; final documents are issued only for the agreed project scope.

Prepare before proposal

Four documents that create a stronger technical conversation.

These are content guides, not pre-issued specifications. Their purpose is to make the project inputs, interfaces and unknowns visible before a model, material or performance expectation is treated as final.

Start with the known facts

Project duty sheet

A short, structured summary of flow or solids duty, operating profile, target outcome, industry, country and open technical questions. It creates a stronger first discussion than an unstructured email.

Use this in the RFQ

Turn layout into a design input

General arrangement review

Share available footprint, elevations, access routes, drainage, utilities and connected equipment. These constraints help identify where a catalogue family needs project-specific configuration.

Use this in the RFQ

Keep evidence visible

Water / sludge characterization brief

Provide laboratory data, sample history, observed variability, chemical information and the desired process objective. Performance expectations should be linked to this evidence and the approved design basis.

Use this in the RFQ

Clarify who supplies each hand-off

Scope and interface checklist

Make feed, dosing, drainage, discharge, supports, controls, instrumentation, conveying and site-level integration responsibilities visible before order.

Use this in the RFQ

How to use the library

Keep evidence, assumptions and scope boundaries separate.

01

Collect measured facts

Gather available samples, flows, solids information, production pattern, utility data and current process drawings.

02

Mark open questions

Identify what needs sampling, treatability work, site survey or technical clarification instead of filling gaps with assumptions.

03

Review the operating line

Make feed, dosing, collection, dewatering, transfer, controls and maintenance interfaces visible before final scope discussion.

04

Start a focused RFQ

Send the structured basis to Peter so the next conversation can be organized around the actual equipment duty.